THE BRIDGE THAT SWAYED

摇摆桥

When the London Miilennium footbridge was opened in June 2000, it swayed alarmingly. This generated huge public interest and the bridge became known as London's wobbiy bridge.

 

The Millennium Bridge is the first new bridge across the river Thames in London since Tower Bridge opened in 1894, and it is the first ever designed for pedestrians only. The bridge links the City of London near St Paul's Cathedral with the Tate Modern art gallery on Bankside.

 

The bridge opened initially on Saturday 10th June 2000. For the opening ceremony, a crowd of over 1,000 people had assembled on the south half of the bridge with a band in front. When they started to walk across with the band playing, there was immediately an unexpectedly pronounced lateral movement of the bridge deck. It was a fine day and the bridge was on the route of a major charity walk, one of the pedestrians recounted what he saw that day. At first, it was still. Then it began to sway sideways, just slightly. Then, almost from one moment to the next, when large groups of people were crossing, the wobble intensified. Everyone had to stop walking to retain balance and sometimes to hold onto the hand rails for support.M Immediately it was decided to limit the number of people on the bridge, and the bridge was dubbed the wobblyf bridge by the media who declared it another high-profile British Millennium Project failure. In order to fully investigate and resolve the issue the decision was taken to dose the bridge on 12th June 2000.

 

Arup, the leading member of the committee in charge of the construction of the bridge, decided to tackle the issue head on. They immediately undertook a fast-track research project to seek the cause and the cure. The embarrassed engineers found the videotape that day which showed the center span swaying about 3 inches sideways every second and the south span 2 inches every 1.25 seconds. Because there was a significant wind blowing on the opening days (force 3-4) and the bridge had been decorated with large flags, the engineers first thought that winds might be exerting excessive force on the many large flags and banners, but it was rapidly concluded that wind buffeting had not contributed significantly to vibration of the bridge. But after measurements were made in university laboratories of the effects of people walking on swaying platforms and after large-scale experiments with crowds of pedestrians were conducted on the bridge itself, a new understanding and a new theory were developed.

 

The unexpected motion was the result of a natural human reaction to small lateral movements. It is well known that a suspension bridge has tendency to sway when troops march over it In lockstep, which is why troops are required to break step when crossing such a bridge. uif we walk on a swaying surface we tend to compensate and stabilise ourselves by spreading our legs further apart-but this increases the Lateral push". Pat DalLard, the engineer at Arup, says that you change the way you walk to match what the bridge is doing. It is an unconscious tendency for pedestrians to match their footsteps to the sway, thereby exacerbating it even more. It's rather like walking on a rolling ship deck-you move one way and then the other to compensate for the roll.M The way people walk doesn't have to match exactly the natural frequency of the bridge as in resonance-the interaction is more subtle. As the bridge moves, people adjust the way they walk in their own manner. The problem is that when there are enough people on the bridge the total sideways push can overcome the bridge's ability to absorb it. The movement becomes excessive and continues to increase until people begin to have difficulty in walking-they may even have to hold on to the rails.

 

Professor Fujino Yozo of Tokyo University, who studied the earth-resistant Toda Bridge in Japan, believes the horizontal forces caused by walking, running or jumping could also in turn cause excessive dynamic vibration In the lateral direction in the bridge. He explains that as the structure began moving, pedestrians adjusted their gait to the same lateral rhythm as the bridge; the adjusted footsteps magnified the motion-just Like when four people all stand up in small boat at the same time. As more pedestrians locked into the same rhythm, the increasing oscillation ied to the dramatic swaying captured on film until people stopped walking altogether, because they could not even keep upright.

 

In order to design a method of reducing the movements, an immediate research program was launched by the bridge's engineering designer Arup. It was decided that the force exerted by the pedestrians had to be quantified and related to the motion of the bridge. Although there are some descriptions of this phenomenon in existing literature, none of these actually quantifies the force. So there was no quantitative analytical way to design the bridge against this effect. The efforts to solve the problem quickly got supported by a number of universities and research organisations.

 

The tests at the University of Southampton involved a person walking on the spot on a small shake table. The tests at Imperial College involved persons walking along a specially built, 7.2m-lons platform, which could be driven laterally at different frequencies and amplitudes. These tests have their own limitations. While the Imperial College test platform was too short that only seven or eight steps could be measured at one time, the Mwalking on the spot" test did not accurately replicate forward walking, although many footsteps could be observed using this method. Neither test could investigate any influence of other people in a crowd on the behavior of the individual tested.

 

The results of the laboratory tests provided information which enabled the initial design of a retrofit to be progressed. However, unless the usage of the bridge was to be greatly restricted, only two generic options to improve its performance were considered feasible. The first was to increase the stiffness of the bridge to move all its Lateral natural frequencies out of the range that could be excited by the lateral footfall forces, and the second was to increase the damping of the bridge to reduce the resonant response.

题目:

Questions 14-17

Choose FOUR letters, A-I.

Write the correct letters in boxes 14-17 on your answer sheet

Which FOUR of the following could be seen on the day when the bridge opened to the public?

A the bridge moved vertically

B the bridge swayed from side to side

C the bridge swayed violently throughout the opening ceremony

D it was hard to keep balance on the bridge

E pedestrians walked in synchronised steps

F pedestrians lengthened their footsteps

G a music band marched across the bridge

H the swaying rhythm varied to the portions of the bridge

I flags and banners kept still on the bridge

 

Questions 18-23

Complete the summary below.

Choose NO MORE THAN TWO WORDS from the passage for each answer.

Write your answers in boxes 18-23 on your answer sheet.

To understand why the Millennium Bridge swayed, engineers of Arup studied the videotape taken on the day of the opening ceremony. In the beginning they thought the forces of 18____ might have caused the movement because there were many flags and banners on the bridge that day. But quickly new understandings arose after series of tests were conducted on how people walk on 19____floors. The tests showed people would place their legs 20_____to keep balance when the floor is shaking. Pat Dallard even believes pedestrians may unknowingly adjust their 21_____ to match the sway of the bridge. Professor Fujino Yozo's study found that the vibration of a bridge could be caused by the 22______ of people walking, running and jumping on it because the lateral rhythm of the sway could make pedestrians adjust their walk and reach the same step until it is impossible to stand 23_____ .

Questions 24-26

Complete the table below.

Choose NO MORE THAN THREE WORDS from the passage for each answer. Write your answers in boxes 24-26 on your answer sheet

 

我们还有中文译文,已经答案解析哦!如有需要的同学,也请提交“姓名+电话+邮箱”,我们将于24小时内发送给你!

或者你也可以在线咨询索取→咨询上海新航道

相关热点: 雅思阅读真题
免费领取资料

免费领取最新剑桥雅思、TPO、SAT真题、百人留学备考群,名师答疑,助教监督,分享最新资讯,领取独家资料。

方法1:扫码添加新航道老师

微信号:shnc_2018

方法2:留下表单信息,老师会及时与您联系

热门课程

  • 走读班(6-10人)
  • 走读班(20-30人)
  • 住宿班(6-10人)
  • 住宿班(20-30人)
  • 雅思一对一
课程名称 班级人数 课时 学费 报名
雅思入门段(A段)6-10人班 6-10人 80课时 ¥18800 在线咨询
雅思强化段(C段)6-10人班 6-10人 101课时 ¥26800 在线咨询
雅思全程段(A+B+C段)6-10人班 6-10人 192课时 ¥45800 在线咨询
雅思精讲段(B段)6-10人班 6-10人 96课时 ¥25800 在线咨询
雅思口语单项班 15-20人 按需定制 在线咨询
课程名称 班级人数 课时 学费 报名
雅思强化段(C段)20-30人班 20-30人 96课时 ¥8800 在线咨询
雅思精讲段(B段)20-30人班 20-30人 96课时 ¥7800 在线咨询
雅思全程班(A+B+C段)20-30人班 20-30人 192课时 ¥13800 在线咨询
课程名称 班级人数 课时 学费 报名
雅思强化段(C段)6-10人班住宿班 6-10人 152 ¥28800 在线咨询
雅思全程班(A+B+C段)6-10人班住宿 6-10人 304课时 ¥50800 在线咨询
雅思精讲段(B段)6-10人班住宿班 6-10人 152课时 ¥29800 在线咨询
雅思入门段(A段)6-10人班(住宿) 6-10人 80课时 ¥20800 在线咨询
雅思3周特训住宿班 10 228 ¥30800 在线咨询
课程名称 班级人数 课时 学费 报名
雅思强化段(C段)20-30人班住宿班 20-30人 96课时 ¥8800 在线咨询
雅思全程段(A+B+C段)20-30人班住宿 20-30人 192课时 ¥15800 在线咨询
雅思精讲段(B段)20-30人班住宿班 20-30人 96课时 ¥9800 在线咨询
课程名称 班级人数 课时 学费 报名
雅思一对一 1人 按需定制 ¥980元 在线咨询
雅思托福预备班 6-10人 50 ¥9800 在线咨询
雅思免费试听课 不限 ¥0元 在线咨询
雅思口语5月新题刷题实战营 ¥999 在线咨询

免责声明
1、如转载本网原创文章,请表明出处;
2、本网转载媒体稿件旨在传播更多有益信息,并不代表同意该观点,本网不承担稿件侵权行为的连带责任;
3、如本网转载稿、资料分享涉及版权等问题,请作者见稿后速与新航道联系(电话:021-64380066),我们会第一时间删除。

雅思公开课

  • 徐家汇校区
  • 人民广场校区
  • 浦东校区
  • 中山公园校区
  • 杨浦校区
  • 闵行校区
  • 松江校区
  • 出国留学封闭学习中心
  • 地址:徐汇区文定路209号宝地文定商务中心1楼

    乘车路线:地铁1/4号线上海体育馆、3/9号线宜山路站、11号线上海游泳馆站

  • 地址:南京西路338号天安中心24楼

    乘车路线:地铁1、2、8号线人民广场站

  • 地址:浦东新区世纪大道1128号耀通科技大厦3楼(地铁2号线世纪大道站12号口出)

    乘车路线:地铁2、4、6号线世纪大道站

  • 地址:长宁区长宁路1027号兆丰广场6楼608

    乘车路线:二、三四号线至中山公园地铁站,9号口出,从商场1楼进入;或10号口出,从兆丰大厦上电梯6楼。

  • 地址:杨浦区国宾路18号万达广场A座18楼

    乘车路线:地铁10号线五角场站

  • 地址:东川路1779-19号

    乘车路线:地铁5号线 东川路站4号口出

  • 地址:松江大学城四期校区:文汇路928弄想飞天地2204

    乘车路线:地铁9号线松江大学城站下

  • 地址:上海市浦东新区惠南镇拱极路2151号

    乘车路线:地铁16号线惠南站

总部地址:北京市海淀区中关村大街28-1号6层601 集团客服电话:400-097-9266 总部:北京新航道教育文化发展有限责任公司

Copyright © www.xhd.cn All Rights Reserved 京ICP备05069206

  • 微信公众号
  • 微信社群

注册/登录

+86
获取验证码

登录

+86

收不到验证码?

知道了

找回密码

+86
获取验证码
下一步

重新设置密码

为您的账号设置一个新密码

保存新密码

密码重置成功

请妥善保存您的密码
立即登录

为了确保您的帐号安全

请勿将帐号信息提供给他人/机构